This project will give assurance for employment, crop production, food security, poverty eradication, improvement of health and nutrition and socio-economic conditions of farmers and villagers apart from livelihood.There will be 20 Lifts, 19 pump houses, 88 pumps in the project.As per the statistics, these are some of the longest and biggest irrigation systems in the world with a total length of 1832 km, canal length 1531 km, total tunnel length 203 km, and pressure pipeline length 98 km. The project consumes 13,558 mega units and it needs the power of 4627.This is the first project, which has received full permission from the Centre. It will also provide drinking water supply to Hyderabad and Secundrabad cities and villages.24 MW. (Photo: ANI) Hyderabad: Telangana government will inaugurate Kaleswaram lift irrigation project on June 21, an official statement read.Kaleswaram lift irrigation project (KLIP) utilizes only the flood water.The project will change the face and fate of Telangana particularly northern parts i.

The World&pump motors Manufacturers39;s biggest and largest underground pumping station is built in this project.e.This is the first project, which has received full permission from the Centre.The project can supply irrigation water to 13 districts by diverting 180 TMC of Godavari flood water.Project benefits include increased agriculture yield, guarantee crop, increasing of crop intensity and area, agriculture diversification, commercial crops improvement and fish production increasing is possible. This will directly benefit farmers through improving irrigation and allayed and rural improvement activity. Though the project is massive in technical and engineering aspects; land acquisition is very limited because of underground set up like pumping stations, tunnels constructing and usage of existing reservoirs; claims Telangana government.

文章標籤

songjiangtkx 發表在 痞客邦 留言(0) 人氣()